Skip to content
Rows of site containers and cabins lined up on gravel, an empty flatbed trailer, a shed behind.
Situations

Partners and sub-hire

You are a general hire company or an installer, and your customers are asking you for a storage solution you do not have in your fleet.

What triggers it

A customer request outside your catalogue, a tender that calls for storage, or a one-off need you do not want to tie up capital in.

Usual duration
According to your own customer's contract.
Hire unit
By agreement, on terms distinct from a direct hire.

What you need to know

  • It is a different contract, a different contact and different terms: this channel is not handled through the ordinary quote form.
  • The first thing to settle is the chain of responsibility: who delivers, who connects, who attends an incident, and who appears on the certificate of insurance handed to the project owner.
  • A partnership enquiry is dealt with directly. Write to us and say so in the first line, and we will not put you through a end-customer journey.

Supply in five stages

  1. 01

    The call

    Who: You and our hire manager

    What: You describe what you need to power, over what period, and with what connection already in place. In that same conversation we tell you whether this is a case for a hired battery, or a case for something else.

  2. 02

    The survey

    Who: Our engineer, on site or from drawings

    What: Heavy goods vehicle access, ground bearing capacity, available footprint, means of unloading, distance to the connection point. On a straightforward site, a drawing and photographs are enough.

  3. 03

    The delivery

    Who: Our haulier

    What: The equipment arrives, it is unloaded and set down in the agreed position. The outgoing condition report is signed at that moment.

  4. 04

    The connection

    Who: Our engineer, with your electrician

    What: Connection, energisation, checking of protective devices, load test. You leave with the procedure to follow and the number to call.

  5. 05

    The collection

    Who: Us

    What: De-energisation, disconnection, removal, incoming condition report. The hire ends when the equipment is collected, not when you call.

When it is not the right answer

If your customer can deal with us directly and you have no interest in carrying the contract, we will say so rather than sell you a pointless middleman.

All situations

A project in the works?

Let’s talk about it now.

Request a quote